"CS605 Quiz No. 1"
Multiple Choice Question
6 February 2021
Question No: 1
______ is defined as the probability of failure free operation of a computer program in a specified environment for a specified time.
► Software Reliability
► Software Usability
► Software Integrity
► Software Efficiency
Question No: 2
Schedule Performance Index SPI) is equal to
► BCWP / BCWS
► BCWP * BCWS
► BCWP + BCWS
► BCWP - BCWS
Question No: 3
The two objectives of a _____ are to identify problem areas within the work product and a checklist of action items.
► Review Issue List
► Formal Technical Reviews
► Informal Technical Reviews
► Testing
Question No: 4
It is noted that a/an ___________ review can be worse then no review at all
► Uncontrolled
► Controlled
► Intermediate
► Normal
Question No: 5
The Review participants SHOULD NOT be focused on _______.
► Weaknesses of the developer
► Time Lines
► Review agenda
► Work product
Question No: 6
The progress on a project at any given point in time can be calculated by:
► Adding all the BCWS till that point for all tasks
► Multiplying all the BCWS till That point for all task
► Adding BCWS and EVA for all task still that point
► Dividing all the BCWS till That point for al tasks
Question No: 7
Milestone represents:
► The defined target which you need to achieve
► A predictable risk that may hit the project
► An unpredictable risk that may project
► The Loss that organization may suffer due to risk
Question No: 8
If an error related to requirements is identified in testing phase, error will be considered an error of ________ phase.
► Requirement
► Design
► Code
► Testing
Question No: 9
________ involves rework, repair, and failure mode analysis of the product.
► Internal Failure Cost
► External Failure Cost
► Appraisal Cost
► Prevention Cost
Question No: 10
If:
E = Errors found before shipment
D = Errors found during operation
Then Defect Removal Efficiency (DRE) is equal to:
► DRE = E = / (E+D)
► DRE = E = * (E+D)
► DRE = E = + (E+D)
► DRE = E = - (E+D)
"CS605 Quiz No. 1"(2)
Multiple Choice Question
6 February 2021
Question No: 1
BCWS is term used in Eamed Value Analysis it stands for _____.
► Budgeted Cost of Work Schedule
► Budgeted Cost of Whole System
► Beginning Cost of Whole System
► None of the given options
Question No: 2
______ states that 80% of the defects can be traced to 20% of its causes.
► Pareto Principle
► Fred Brooks Principle
► Kraul Principle
► D.Streeter Principle
Question No: 3
The basis principle for a review is that the focus should be on the _________..
► Product and not the producer
► producer and not the Product
► Profit to be gained
► Presentation Slide
Question No: 4
Many defect identified in few components at design level testing/review, a software development team should _____.
► Allocate good and extra resources at coding level to review these components thoroughly
► Good achievement by designing team
► No need to allocated further resources at coding level to review these components
► Mission accomplished once good number of error/flaws identified level
Question No: 5
Milestone represents:
► The defined target which you need to achieve
► A predicable risk that may hit the project
► A unpredictable risk that may hit the project
► The Loss that organization may suffer due to risk
Question No: 6
______ a statistical technique is used to develop an overall indication of improvement in software quality.
► Error index
► Pareto Principle
► Quality Assurance
► Cost of Quality
Question No: 7
A model where Some errors are passed through to the next stem undebated such errors are said to have been______.
► Amplified
► Reduced
► Neutralized
► Multiplexed
Question No: 8
Earned Value Analysis (EVA) is a _____________ technique for assessing the progess of a project.
► Quantitative
► Subjective
► Qualitative
► Descriptive
Question No: 9
It is noted that a/an ________ review can be worse than no review at all.
► Uncontrolled
► Controlled
► Intermediate
► Normal
Question No: 10
FTR is a quality control activity performed by software enginers.it stands for:
► Formal Technical Review
► Formatted Technical Review
► Feasibility of Technical Requirement
► Fetched Technical Requirement
"CS605 Quiz No. 2"
Multiple Choice Question
12 February 2021
Question No: 1
Legacy system migration however is a ________________ task and there are a number of risks involved that need to be mitigated.
► Crucial
► Simple
► Straight-forward
► Easy
Question No: 2
An Engineering Change Order (ECO) defines the change be made, its constraints and ________.
► Criteria for Review and Audit
► Removal of Change Request
► Approval by change control Board (CCB)
► Approval by Change Control Authority (CCA)
Question No: 3
A system is considered to be a legacy system if it has been in operation for _________ years. A legacy system has many components.
► Many
► Less then seven
► More than two
► Less than ten
Question No: 4
A major issue in requirements engineering is the rate at which requirements change once the requirements phase has "officially"________.
► Ended
► Approved
► Deleted
► Started
Question No: 5
The implemented requirement has been ______ through the selected approach, such as testing or inspection.
► Verified
► Deleted
► Approved
► Ignored
Question No: 6
According to a standish Group report, lack ______ is responsible for 13% of all project failures,
► User input
► Output
► Resources
► Development Plan
Question No: 7
_________ is a quality assurance process used to reduce defects by avoiding or correcting mistakes in early design and development phases.
► Poka-Yoke
► Software Testing
► Software Change management
► Defect Removal
Question No: 8
According to Clemm, __________ allows the user to specify alternative forms of the system the selection of a appropriate versions.
► Configuration Management
► Process Management
► Quality Management
► Cost Management
Question No: 9
______ is the probability that a program is operating according to requirements at a given point in time.
► Availability
► Reliability
► Usability
► Security
Question No: 10
_____ enhance the product feature set by replacing a product with a newer version of the same product.
► Upgrade
► Re-Engineering
► Update
► Deployment
"CS605 Quiz No. 2"(2)
Multiple Choice Question
12 February 2021
Question No: 1
The equation to find out the Availability of software is:
► Availability = (MTTF / MTBF) x 100
► Availability = (MTTF / MTBF) / 100
► Availability = (MTTF + MTBF) / 100
► Availability = (MTTF - MTBF) / 100
Question No: 2 (rep)
According to a standish Group report, lack ______ is responsible for 13% of all project failures,
► User input
► Output
► Resources
► Development Plan
Question No: 3
The software reengineering is a _________ activity.
► Non-trivial
► Code
► Out dated
► Document
Question No: 4
A Software Requirement Specification (SRS) is traced if the ______ of requirements is clear.
► Origin
► Quality
► Standard
► Grammar
Question No: 5 (rep)
The implemented requirement has been ______ through the selected approach, such as testing or inspection.
► Verified
► Deleted
► Approved
► Ignored
Question No: 6 (rep)
A major issue in requirements engineering is the rate at which requirements change once the requirements phase has "officially"________.
► Ended
► Approved
► Deleted
► Started
Question No: 7
_______ are used by the development as a staging mechanism for functionality including regular builds.
► Internal releases
► External releases
► Major releases
► Feature releases
Question No: 8
________ are mechanisms that lead to prudential quality problem before it occur or its rapid detection it introduced.
► Mistake-Proofing
► Mistake-Profiling
► Mistake-Provoking
► Mismanagement-Proofing
Question No: 9
Version Control discusses about:
► How does an Organization control changes before and after installation released to a customer.
► How the resources will be assigned to tasks in work breakdown structure (WBS).
► How the test cases will be executed before deploying each release.
► How many feature will be included in software.
Question No: 10 (rep)
______ is the probability that a program is operating according to requirments at a given point in time.
► Availability
► Reliability
► Usability
► Security
"CS605 Quiz No. 2"(3)
Multiple Choice Question
12 February 2021
Question No: 1 (rep)
A major issue in requirements engineering is the rate at which requirements change once the requirements phase has "officially"________.
► Ended
► Approved
► Deleted
► Started
Question No: 2 (rep)
_________ is a quality assurance process used to reduce defects by avoiding or correcting mistakes in early design and development phases.
► Poka-Yoke
► Software Testing
► Software Change management
► Defect Removal
Question No: 3 (rep)
________ are mechanisms that lead to prudential quality problem before it occur or its rapid detection it introduced.
► Mistake-Proofing
► Mistake-Profiling
► Mistake-Provoking
► Mismanagement-Proofing
Question No: 4
Which of the following is NOT one the tasks includes in Software Configuration Management.
► Test Case development
► Version Control
► Configuration Auditing
► Change Control
Question No: 5 (rep)
An Engineering Change Order (ECO) defines the change be made, its constraints and ________.
► Criteria for Review and Audit
► Removal of Change Request
► Approval by change control Board (CCB)
► Approval by Change Control Authority (CCA)
Question No: 6 (rep)
According to a standish Group report, lack ______ is responsible for 13% of all project failures,
► User input
► Output
► Resources
► Development Plan
Question No: 7 (rep)
The software reengineering is a _________ activity.
► Non-trivial
► Code
► Out dated
► Document
Question No: 8
____ error are most costly to fix.
► Requirement
► Design
► Implementation
► Testing
Question No: 9 (rep)
The equation to find out the Availability of software is:
► Availability = (MTTF / MTBF) x 100
► Availability = (MTTF / MTBF) / 10
► Availability = (MTTF + MTBF) / 10
► Availability = (MTTF - MTBF) / 100
Question No: 10
________ analysis is the first step in the reengineering process.
► Inventory
► Code
► Database
► Document
Best of Luck
YouTube Link:
https://www.youtube.com/c/VUEDUCATIONS
Facebook Page Link:
https://www.facebook.com/Vu-education-100866618120553/
WhatsApp Group Link:
https://chat.whatsapp.com/KEa5lP65yMdEF8BnmkC8jN
Tags
cs605 quiz 2 solution 2021, cs605 quiz 1 solution 2021, cs605 quiz 2 solve,
vu education, virtual university, vu, vu past papers,"
#virtual university, #vu #cs605quizsolution2021 #cs605quizsolution #cs605
#cs605quiz1solve #cs605quiz23solve #vueducation
0 Comments